MDC第二論壇
MDC第二論壇
首頁 | 會員資料 | 註冊 | 最新發表 | 會員列表 | 傳訊 | 搜尋 | 常見問題
登入名稱:
密碼:
記住密碼
Forgot your Password?

 論壇首頁
 軍事討論區
 國軍與警察事務
 台灣軍事新聞評論專文研析2011-9
 發表新標題  Topic Locked
 友善列印
前頁 | 次頁
作者 前一個標題 標題 下一個標題
到第 頁,共 17頁

ian125
我是老鳥

8328 Posts

Posted - 12/08/2011 :  10:45:43  會員資料  Visit ian125's Homepage  Click to see ian125's MSN Messenger address Send ian125 a Private Message
兩個合約
The Boeing Co., Mesa, Ariz., was awarded a $141,318,475 firm-fixed-price contract. The award will provide for the services in support of 30 Apache AH-64D attack helicopters for Taiwan. Work will be performed in Mesa, Ariz., with an estimated completion date of Dec. 30, 2017. One bid was solicited, with one bid received. The U.S. Army Contracting Command, Redstone Arsenal, Ala., is the contracting activity (W58RGZ-09-C-0147).
阿帕契,這很好理解

Raytheon Integrated Defense Systems, Sudbury, Mass., is being awarded a $42,913,894 cost-plus-fixed-fee and firm-fixed-price contract for the Surveillance Radar Program is a Foreign Military Sales Program managed by the Electronic Systems Center to provide Taiwan with the elements of a missile and air defense capability. Specifically, this system includes a UHF phased array radar integrated with Taiwan-furnished Identification Friend-or-Foe beacons; two Missile Warning Centers; and communications and interface architecture and protocol to specified Taiwan mission elements via the Taiwan military communications infrastructure, consistent with USG restrictions. The location of the performance is Sudbury, Mass., and is expected to be completed Nov. 9, 2012. ESC/HSIK, Hanscom Air Force Base, Mass., is the contracting activity (FA8722-05-C-0001 P00062).
...這個就看不懂了,好像是跟鋪路爪有關

是說有人居然說空中機動是上個世紀過時的玩意,現在根本不需要這種東西...
Go to Top of Page

hwp2003
路人甲乙丙

Taiwan
960 Posts

Posted - 12/08/2011 :  15:02:37  會員資料 Send hwp2003 a Private Message
http://udn.com/NEWS/BREAKINGNEWS/BREAKINGNEWS1/6768577.shtml
胡鎮埔爆料 陸軍澄清槓前司令
【聯合晚報╱記者洪哲政/即時報導】
2011.12.08 01:40 pm

前陸軍司令胡鎮埔以主管全軍作戰之姿,出書質疑陸軍採購AH-64D阿帕契攻擊直升機、雲豹八輪甲車武器配備、雷霆2000多管火箭載重車與新一代夜視鏡光放管有弊端,疑雲重重。陸軍司令部上午派遣主管官員,一一加以說明澄清,並強調,現在時空環境已有不同,前司令所述與事實有出入。陸軍此舉形同槓上前司令。

陸軍司令部表示,胡鎮埔所稱當年鎖定的AH-1Z直升機,當年美軍還在還在測評中,所以陸軍最後只能選擇以軍售管道取得阿帕契,而且阿帕契陸軍早在89年就曾經研究;至於雲豹甲車原採用的25公厘機砲,但當時廠商將價格拉高達到1倍,所以現在陸軍朝30機砲,採取技術合作國內生產獲得;而雷霆2000拖車原計畫與美商併案發展,但美商報價太高,且期程無法配合,而輪式也曾於95年在外島測試,不符戰術需求。

至於光放管問題,陸軍司令部說,當年單兵夜視鏡採用的舊款光放管,確實造成官兵頭暈現象,但最後查究是視焦對距的問題,但不管如何,陸軍目前已採用與美國國內生產相同的第3代光放管,解決問題。

Go to Top of Page

dasha
版主

41804 Posts

Posted - 12/08/2011 :  15:04:12  會員資料 Send dasha a Private Message
UHF頻的相位陣列,與台灣有關的應該只有舖爪,這種頻率只有超地平線雷達之類會用,根本不能射控......
現在部隊的規模變小了,大不了只有空中機動旅,不像過去會有師甚至是軍,但要說過時,是被老德的文章影響的?
Go to Top of Page

小毛
我是老鳥

Taiwan
10742 Posts

Posted - 12/13/2011 :  10:17:44  會員資料  Visit 小毛's Homepage Send 小毛 a Private Message
看起來駕駛都是經驗豐富,造成裝備損毀難道又是耍帥....???

http://news.chinatimes.com/politics/11050202/112011121300162.html
超級眼鏡蛇重墜地 幸無人傷亡
陸軍航特部六零二旅一架眼鏡蛇攻擊直升機,昨天在台中新社基地訓練時不慎突槌,因進行「模擬引擎失效」安全高度不足造成直升機「重墜地」,導致該機後橫管、尾旋翼和機砲組等受損,所幸機上兩名飛官只是虛驚一場平安無事。

 航特部對此已成立專案小組調查,在未查明肇因前,該型直升機全面實施特檢暫停飛行訓練。

 陸軍司令部指出,這架AH-1W攻擊直升機是在昨天上午十點三十分在新社基地執行駐地訓練,由少校教官劉銘輝及少校正駕駛朱寶勳依進度操作「模擬引擎失效」,實施關油門「自動旋轉」時,因飛機下降快速,未保持安全高度,導致直升機後橫管、尾旋翼及機砲組觸及地面受損。

 六零二旅長黃國明表示,這架眼鏡蛇直昇機是在進行「模擬引擎失效」的基本自轉練習,當關閉油門讓直昇機自動旋轉安全落地時,因角度沒有抓好,落地重了一點,導致尾旋翼及機砲組撞到跑道受損。

 陸軍強調,正駕駛朱寶勳有八百九十小時的飛行時數,陪同的教官劉銘輝也有九百八十五小時的飛行時數,都是符合資格並飛行經驗豐富的飛官,這次意外究竟是人為疏失或機械問題,已成立專案小組調查。

** 小毛的新幻想空間逐漸復活中.....**
http://lordmrx.pixnet.net/blog
歡迎參觀
Go to Top of Page

dasha
版主

41804 Posts

Posted - 12/13/2011 :  10:35:28  會員資料 Send dasha a Private Message
這本來就是屬於風險比較高的訓練,但又是不得不做的逃生訓練,只能說當事人運氣不好黑了,可能就要準備幾年後改當計程車車長了......
Go to Top of Page

pcgamer
我是老鳥

10093 Posts

Posted - 12/13/2011 :  14:40:07  會員資料 Send pcgamer a Private Message
國內幾個財經媒體傳出台船獲得承包一艘海軍新的油彈補給艦建造合約:
https://www.google.com/search?hl=en&q=%E5%8F%B0%E8%88%B9+%E6%B2%B9%E5%BD%88%E8%A3%9C%E7%B5%A6%E8%89%A6&sourceid=navclient-ff&rlz=1B3GGLS_enTW421TW409&ie=UTF-8#q=%E5%8F%B0%E8%88%B9+%E6%B2%B9%E5%BD%88%E8%A3%9C%E7%B5%A6%E8%89%A6&hl=en&rlz=1B3GGLS_enTW421TW409&prmd=imvns&source=lnt&tbs=qdr:d&sa=X&ei=lfLmTuXJOYWNsQLv3KX0CA&ved=0CAkQpwUoAg&bav=on.2,or.r_gc.r_pw.,cf.osb&fp=23b00f55a5ea8c2d&biw=1265&bih=622

相關的新聞並沒有提及太多此型新船艦的相關細節,像是排水量、自行研發或是採用國外成熟藍圖來建造等。
Go to Top of Page

Bryan C
路人甲乙丙

USA
1455 Posts

Posted - 12/14/2011 :  07:03:36  會員資料  Visit Bryan C's Homepage Send Bryan C a Private Message
It's not like CSBC/TSBC can design a 40,000+ tons AOE by itself. Just like last time, going to need a US firm to provide the blueprints, the special gears, and the know how. Just hope CSBC/TSBC/ROCN won't screw up again, just like last time.....
Go to Top of Page

Reinherd Von Hwang提督
我是老鳥

USA
9567 Posts

Posted - 12/14/2011 :  10:27:25  會員資料  Visit Reinherd Von Hwang提督's Homepage Send Reinherd Von Hwang提督 a Private Message
http://news.chinatimes.com/focus/11050105/112011121400095.html
國防部軍事發言人羅紹和昨晚指出,國防部計畫在民國一○四年推動募兵制的決心不變,至於役男關切是八十三還是八十四年次免當兵的切割點,國防部強調為顧及兵役公平性,依規定須待募兵制實施前一年(一○三年)才能公布。

在常備兵役「現役」與「後備役」 外,增訂「軍事訓練」為役種之一;未來徵兵制停止後,役男仍須接受四個月軍事訓練,各項福利及權利義務比照常備兵標準辦理,役畢後則以常備兵役列管,以符《憲法》「人民有服兵役的義務」之規定。

不過新法也明定,在志願役人數不能滿足兵額時,行政院可回復徵集役男服常備現役。

-----------------------------我是分隔線---------------------------
我覺得整個新兵役法很詭異
因為很多地方其實在為"徵兵制"製造藉口恢復
例如"志願役人數不能滿足兵額時,行政院可回復徵集役男服常備現役。"
這一點就很詭異
如何定義兵額?? 這可以討論嗎?? 假設說以目前國軍的兵力規模 這幾乎是不可能用志願役人數滿足

還有四個月軍事訓練役 這個軍事訓練役的定義是什麼?
是單純在新訓中心呆四個月 還是說真的編成步兵旅下四個月基地??

Go to Top of Page

pcgamer
我是老鳥

10093 Posts

Posted - 12/14/2011 :  11:04:47  會員資料 Send pcgamer a Private Message
僅僅四個月的役期,役男到底可以學到什麼?不要說是作戰技能,連救災救難的技能這一點時間根本不夠教導學習.....國防部是不是太過度便宜行事了??
Go to Top of Page

dasha
版主

41804 Posts

Posted - 12/14/2011 :  12:00:58  會員資料 Send dasha a Private Message
只是抄襲歐陸一些國家的作法而已,幾乎只有新訓......
Go to Top of Page

Captain Picard
我是老鳥

9669 Posts

Posted - 12/14/2011 :  14:53:39  會員資料 Send Captain Picard a Private Message
quote:
Originally posted by pcgamer

僅僅四個月的役期,役男到底可以學到什麼?不要說是作戰技能,連救災救難的技能這一點時間根本不夠教導學習.....國防部是不是太過度便宜行事了??



政府高層執意要進行,國防部也只能勉強照辦了。

=========================

天佑吾「王」!
Go to Top of Page

pcgamer
我是老鳥

10093 Posts

Posted - 12/14/2011 :  16:01:47  會員資料 Send pcgamer a Private Message
>>政府高層執意要進行,國防部也只能勉強照辦了。
國防部這種削足適履的作法,擺明就是陷三軍統帥於不義,當中都沒有人跳出來反對嗎?
之前跟陸航挖15架黑鷹來救災就已經很過分了,這回國防部那堆泡泡星星還要繼續沈默不語嗎?
他們的『專業』都死哪去了?
Go to Top of Page

Bryan C
路人甲乙丙

USA
1455 Posts

Posted - 12/14/2011 :  16:12:08  會員資料  Visit Bryan C's Homepage Send Bryan C a Private Message
Promotion is more important then to be right.....
Go to Top of Page

qaz9491
路人甲乙丙

791 Posts

Posted - 12/14/2011 :  21:32:16  會員資料 Send qaz9491 a Private Message
>>國防部這種削足適履的作法,擺明就是陷三軍統帥於不義,當中都沒有人跳出來反對嗎?

講過了啊,上面就是要這樣幹還能怎麼辦?

>>之前跟陸航挖15架黑鷹來救災就已經很過分了,這回國防部那堆泡泡星星還要繼續沈默不語嗎?
他們的『專業』都死哪去了?

您忘記有一句話叫做 "政治凌駕專業" 嗎?
Go to Top of Page

Captain Picard
我是老鳥

9669 Posts

Posted - 12/16/2011 :  07:53:55  會員資料 Send Captain Picard a Private Message
http://www.defenseindustrydail.....investigation-01546/

台灣針對拉法葉艦再發動新一波訴訟,針對拉法葉後勤的回扣向DCNS求償30億台幣(9840萬美元),為此2012年度國防預算已經編列7500萬美元訴訟費。不過訴訟費跟求償金額相差不會太多,不知道這麼做能否打平。

Oct 12/11: Another lawsuit. In response to a Parliamentary question, Taiwanese Defence Minister Kao Hua-chu says that additional kickbacks have been uncovered, related to supplying parts for the frigates. Taiwan is seeking NT$ 3.0 billion/ $98.4 million in additional compensation from DCNS, above and beyond the sum paid by Thales, for violation of a clause in the May 20/96 Basic Ordering Agreement that prohibited commissions/kickbacks. They are taking the matter to an international court of arbitration, which is also the way the Thales case started. Kao:

“We are confident of winning an arbitration for NT$3 billion in compensation and interest from DCN International (DCNI), France, for its violation of a follow-up contract to provide components and spare parts for the vessels…”

The Defense Ministry has set aside NT$75 million in its 2012 budget plan to fund the new litigation, but Taiwan believes that a victory will also lead to claims for an “arbitration mortgage” and litigation fees, on top of compensation.

=========================

天佑吾「王」!
Go to Top of Page

pcgamer
我是老鳥

10093 Posts

Posted - 12/16/2011 :  10:41:50  會員資料 Send pcgamer a Private Message
>>Taiwan is seeking NT$ 3.0 billion/ $98.4 million in additional compensation from DCNS........
這邊寫的是台幣三十億........

>>The Defense Ministry has set aside NT$75 million in its 2012 budget plan to fund the new litigation......
這邊寫的是台幣七千五百萬.......如果這篇沒寫錯的話,你把計價單位給搞錯了。
要是勝訴的話,七千五百萬換到三十億,那實在是非常、極度划算.........


Go to Top of Page

Reinherd Von Hwang提督
我是老鳥

USA
9567 Posts

Posted - 12/16/2011 :  11:52:54  會員資料  Visit Reinherd Von Hwang提督's Homepage Send Reinherd Von Hwang提督 a Private Message
剛剛有個朋友丟給我的網頁
真實性存疑 大家參考看看就好
http://www.navyrecognition.com/index.php?option=com_content&task=view&id=242
重點有兩個
1. 台灣放棄對美採購潛艦
Taiwan has all but given up on acquiring diesel-electric submarines from the US and is expected to embark on a domestic program with assistance from abroad, a leading defense analyst told the Taipei Times. Longstanding plans to augment Taiwan’s small and aging submarine fleet gained momentum in 2001, when the administration of US president George W. Bush offered to provide eight diesel-electric submarines to Taiwan for about US$12 billion.
2. 決定找海外技術來源 在台灣自力建造
The Naval Shipbuilding Development Center under Navy Command has been very busy studying the blueprints of the navy’s two Hai Lung-class submarines — Taiwan’s only combat-ready subs — which were acquired from the Netherlands in the late 1980s.

Naval authorities are also reportedly readying to send personnel abroad to study production technology or negotiate technology transfers for building pressure-resistant hulls, which sources say is the most challenging aspect in building submarines.

Stokes said a good number of countries have the capabilities sought by Taiwan.

In the initial stage, the navy could limit its domestic program to small subs in the hundreds of deadweight tonnage, the report said.
Go to Top of Page

darkmoon
路人甲乙丙

845 Posts

Posted - 12/16/2011 :  21:15:32  會員資料 Send darkmoon a Private Message
quote:
Originally posted by Reinherd Von Hwang提督

剛剛有個朋友丟給我的網頁



http://www.taipeitimes.com/News/front/archives/2011/12/15/2003520765
據防務分析家指出...(以下省略)
又是不知道去哪邊鋸出來的玩意
Go to Top of Page

Dlin2000
路人甲乙丙

640 Posts

Posted - 12/16/2011 :  21:57:27  會員資料 Send Dlin2000 a Private Message
quote:
Originally posted by Reinherd Von Hwang提督

http://news.chinatimes.com/focus/11050105/112011121400095.html
國防部軍事發言人羅紹和昨晚指出,國防部計畫在民國一○四年推動募兵制的決心不變,至於役男關切是八十三還是八十四年次免當兵的切割點,國防部強調為顧及兵役公平性,依規定須待募兵制實施前一年(一○三年)才能公布。

在常備兵役「現役」與「後備役」 外,增訂「軍事訓練」為役種之一;未來徵兵制停止後,役男仍須接受四個月軍事訓練,各項福利及權利義務比照常備兵標準辦理,役畢後則以常備兵役列管,以符《憲法》「人民有服兵役的義務」之規定。

不過新法也明定,在志願役人數不能滿足兵額時,行政院可回復徵集役男服常備現役。

-----------------------------我是分隔線---------------------------
我覺得整個新兵役法很詭異
因為很多地方其實在為"徵兵制"製造藉口恢復
例如"志願役人數不能滿足兵額時,行政院可回復徵集役男服常備現役。"
這一點就很詭異
如何定義兵額?? 這可以討論嗎?? 假設說以目前國軍的兵力規模 這幾乎是不可能用志願役人數滿足

還有四個月軍事訓練役 這個軍事訓練役的定義是什麼?
是單純在新訓中心呆四個月 還是說真的編成步兵旅下四個月基地??




四個月真的不夠六個月才夠
拿sleep大大的文章
機槍、榴彈槍、反裝甲火箭、60迫的專長訓,以及排攻擊防禦與城陣戰鬥,六個月不過份
這一點我蠻認同的
但是除了六個月以後每年的教召一定不可少
Go to Top of Page

Bryan C
路人甲乙丙

USA
1455 Posts

Posted - 12/18/2011 :  16:04:51  會員資料  Visit Bryan C's Homepage Send Bryan C a Private Message
Recent contracts to Taiwan.

December 01, 2011

http://www.defense.gov/contracts/contract.aspx?contractid=4675

The Boeing Co., St. Louis, Mo., is being awarded an $9,201,764 firm-fixed-price modification to a previously issued basic ordering agreement (N00019-11-G-0001) to exercise an option to provide integrated logistics and engineering services support for the Harpoon and Standoff Land Attack Missile Expanded Response Missile System and Harpoon Launch Systems for the U.S. Navy and the governments of various foreign military sales customers. Work will be performed in St. Charles, Mo. (91.17 percent); St. Louis, Mo. (5.43 percent); Yorktown, Va. (2.64 percent); Point Mugu, Calif. (0.71 percent); and Oklahoma City, Ok. (0.05 percent), and is expected to be completed by November 2013. Contract funds in the amount of $3,296,312 will expire at the end of the current fiscal year. This modification combines purchases for the U.S. Navy (35.82 percent); and, under the Foreign Military Sales Program, the governments of Korea (8.22 percent), Turkey (6.94 percent), Taiwan (5.06 percent), Japan (4.72 percent), Egypt (4.62 percent), Greece (3.88 percent), United Kingdom (3.63 percent), Pakistan (3.07 percent), Australia (2.97 percent), Chile (2.76 percent), Canada (2.24 percent), Saudi Arabia (2.34 percent), Israel (2.04 percent), Singapore (2.03 percent), Thailand (1.45 percent), Bahrain (1.24 percent), United Arab Emirates (1.10 percent), Germany (1.09 percent), Netherlands (1.09 percent), Portugal (0.82 percent), Kuwait (0.81 percent), Malaysia (0.76 percent), Oman (.74 percent), and Denmark (.55 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.

December 06, 2011

http://www.defense.gov/contracts/contract.aspx?contractid=4678

Wyle Laboratories, Inc., Huntsville, Ala., is being awarded a $33,693,891 modification to a previously awarded indefinite-delivery/indefinite-quantity multiple award contract (N00421-03-D-0015) to execute an award term for continued E-2C/E-2D/C-2 planning, program, and financial services in support of the Navy (79 percent); and under the Foreign Military Sales Program, the governments of France, Taiwan, Egypt, Japan, Singapore, and Canada (21 percent). Work will be performed in Patuxent River, Md., and is expected to be completed in December 2012. No funding is being obligated at time of award. Funding will be obligated on individual task orders as they are issued. Contract funds will not expire at the end of the current fiscal year. The Naval Air Warfare Center Aircraft Division, Patuxent River, Md., is the contracting activity.

December 07, 2011

http://www.defense.gov/contracts/contract.aspx?contractid=4679

The Boeing Co., Mesa, Ariz., was awarded a $141,318,475 firm-fixed-price contract. The award will provide for the services in support of 30 Apache AH-64D attack helicopters for Taiwan. Work will be performed in Mesa, Ariz., with an estimated completion date of Dec. 30, 2017. One bid was solicited, with one bid received. The U.S. Army Contracting Command, Redstone Arsenal, Ala., is the contracting activity (W58RGZ-09-C-0147).

Raytheon, Andover, Mass., was awarded a $12,662,904 firm-fixed-price, cost-plus-fixed-fee, and cost-reimbursable contract. The award will provide for the modification of an existing contract for technical services in support of the PATRIOT Air Defense System for Taiwan. Work will be performed in El Paso, Texas, and Taipei, Taiwan, with an estimated completion date of Dec. 31, 2015. One bid was solicited, with one bid received. The U.S. Army Contracting Command, Redstone Arsenal, Ala., is the contracting activity (W31P4Q-11-C-0317).

December 13, 2011

http://www.defense.gov/contracts/contract.aspx?contractid=4683

Lockheed Martin Corp., doing business as Lockheed Martin Global Training and Logistics, Gaithersburg, Md., is awarded an estimated $11,374,978 cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity, performance-based services contract to provide security cooperation, assistance, and foreign military sales technical and program/project management support services to Naval Supply Systems Command Weapon Systems Support and Navy International Programs Office. This contract contains options, which, if exercised, will bring the contract value to $42,185,374. All funding provided under this contract will be applied at the task order level. This contract combines support services for the Navy (25 percent); and, under the Foreign Military Sales Program, countries to include, but are not limited to, Spain, Australia, Israel, Egypt, Taiwan, Malaysia, Kuwait, Finland, Canada, and Japan (75 percent). Work will be performed at the Naval Support Activity, Philadelphia, Pa. (75 percent), and the Navy International Programs Office, Washington, D.C. (25 percent). Work is expected to be completed Dec. 12, 2013. The contract was solicited on a full and open competition basis, with two offers received. Contract funds will not expire at the end of the current fiscal year. The Fleet Logistics Center Norfolk, Philadelphia, Pa., is the contracting activity
Go to Top of Page

ian125
我是老鳥

8328 Posts

Posted - 12/18/2011 :  23:03:24  會員資料  Visit ian125's Homepage  Click to see ian125's MSN Messenger address Send ian125 a Private Message
最後那個是跟補給艦有關?
Go to Top of Page

rockitten
我是老鳥

Australia
8191 Posts

Posted - 12/18/2011 :  23:34:23  會員資料 Send rockitten a Private Message
quote:
Originally posted by ian125

最後那個是跟補給艦有關?


"to provide security cooperation, assistance, and foreign military sales technical and program/project management support services"

sounds like a consultant job

小貓不會作模型,小貓只愛玩模型;看似小貓玩模型,其實模型玩小貓:
A B 補土白膠條,樹脂改套蝕刻片;凹線凸線凹凸線,乾磨水磨銼刀磨;
水性油性消光漆,乾掃手掃噴槍掃;模型一盒三百幾,零件一堆三千幾;
多買多作進步多,買了不作口水多;花錢耗時傷精神,小貓是隻敗家喵。
Go to Top of Page

慎.中野
我是老鳥

27930 Posts

Posted - 12/21/2011 :  09:03:45  會員資料 Send 慎.中野 a Private Message
http://tw.nextmedia.com/realtimenews/article/local/20111221/101948/1
快訊 惡煞夜闖軍營毆人 9人傷
2011年12月21日08:13 蘋果即時

金門縣今天凌晨0時許,傳出一起營區鬥毆事件,隸屬金防部的金東守備隊屏東文康營區遭多名不明身分男子持棍棒闖入尋仇。金防部立即要求全軍加強警戒,封鎖消息,待國防部今天上午派員調查。

據悉,歹徒壓制門口衛哨後,直奔特定營房見人就打,鍾姓守備隊隊長等官兵在睡夢中遭人痛毆;歹徒在營區逞兇鬥狠歷時10多分鐘後離去。

鍾姓守備隊長等9人送進醫院,傳出其中有傷患因為頭部遭痛擊,發出病危通知,目前情況暫為好轉,仍在加護病房觀察。
----


國軍不意外。
以現在的警備狀況,這種事情找幾個有經驗的誰都辦得到。



----
「我乃是根據個人一向仰賴的研究方法而得出結論。我的方法就是:道聽途說加上斷章取義,然後歸納推理,最後忘掉訊息來源,開始強詞奪理,堅持我所言就是既定事實。」
史考特.亞當斯,《呆伯特之黃鼠狼當道》
Go to Top of Page

dasha
版主

41804 Posts

Posted - 12/21/2011 :  11:24:03  會員資料 Send dasha a Private Message
該恢復以前那種可以開槍的崗哨了,否則老共特種部隊突襲,可能會發生連上級都不相信的驚人戰果......
Go to Top of Page

hwp2003
路人甲乙丙

Taiwan
960 Posts

Posted - 12/21/2011 :  16:19:01  會員資料 Send hwp2003 a Private Message
http://udn.com/NEWS/BREAKINGNEWS/BREAKINGNEWS1/6795780.shtml
陸敬武移孝作忠救災,將晉升中校

【聯合報╱記者程嘉文/即時報導】

2011.12.21 04:00 pm

去年8月南瑪都颱風期間遭遇父喪,仍在前線救災的海軍陸戰隊66旅少校陸敬武,曾獲馬總統在軍人節大會公開肯定。海軍表示,陸敬武已調任旅部情報科長,將於明年元旦晉升中校。

陸敬武原擔任陸戰隊66旅的副營長,率部在屏東縣牡丹鄉山地協助撤離,接獲家人電話告知父親去世,仍決定繼續留在第一線救災,不向部隊告假。經由民眾告知記者披露後,軍中長官才得知,立刻讓他返家奔喪。陸敬武事後表示,父親是榮民,相信會認同自己以公事為先的決定。
Go to Top of Page
到第 頁,共 17頁 前一個標題 標題 下一個標題  
前頁 | 次頁
 發表新標題  Topic Locked
 友善列印
直接前往:
MDC第二論壇 © 2000-2002 Snitz Communications Go To Top Of Page
Powered By: Snitz Forums 2000 Version 3.4.04